Space News
space history and artifacts articles

Messages
space history discussion forums

Sightings
worldwide astronaut appearances

Resources
selected space history documents

  collectSPACE: Messages
  Stamps & Covers
  Space Cover 03: RMS First Deploy and Testing

Post New Topic  Post A Reply
profile | register | preferences | faq | search

next newest topic | next oldest topic
Author Topic:   Space Cover 03: RMS First Deploy and Testing
yeknom-ecaps
Member

Posts: 660
From: Northville MI USA
Registered: Aug 2005

posted 05-04-2009 09:06 PM     Click Here to See the Profile for yeknom-ecaps   Click Here to Email yeknom-ecaps     Edit/Delete Message   Reply w/Quote
Space Cover of the Week, Week 3 (May 4, 2009)

Space Cover #3, RMS First Deployment and Testing

This "space cover of the week" posting shows two related covers. A collector from Canada was especially interested in creating covers for Canadian related space activities. In this case he created covers for the Canadarm "Remote Manipulator System" (RMS) developed for use on the shuttle. STS-3 was the first deployment and testing of the RMS. To document this testing he contacted the builder, SPAR Aerospace Limited in Weston, Ontario, and was able to have covers hand carried with the RMS project manager at NASA JSC in Houston and the Systems Engineer at the SPAR Aerospace facility in Canada. A total of 10 different covers were carried and documented throughout the STS-3 mission (7 JSC, 3 Weston). The covers shown above have been documented as to the initial deployment and testing that took place on 3/23/1982 and signed by the people carrying them. The NASA JSC cover was cancelled 3/24 in Houston and the SPAR Aerospace cover was cancelled 3/23 in Weston. Unfortunately, because of the color ink for the cancels they do not show up well on the scans.

The Houston cover (top):
Date of Test: 23 March 82
Time of Test: 082:14:37 GMT
Duration of Test: 15 mins
Type of Test: Arm First Deployed
signed: RMS project manager and head of public affairs

The Weston cover (bottom):
Date of Test: Mar 23 1982
Time of Test: 10-30 am EST
Type of Test: Unloaded Arm Tests
Duration of Test: 4 hours
signed SPAR Systems Engineer

All times are CT (US)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply
Hop to:

Contact Us | The Source for Space History & Artifacts

Copyright 2020 collectSPACE.com All rights reserved.


Ultimate Bulletin Board 5.47a





advertisement