|
|
Author
|
Topic: Spacecraft and rocket contractor patches
|
dtemple Member Posts: 798 From: Longview, Texas, USA Registered: Apr 2000
|
posted 03-08-2025 02:38 PM
Let's see contractor patches. Here are most of mine. Chrysler was the prime contractor for the Saturn S-1 and S-1B stages. Bendix produced the landing gear for the lunar module (LM). NAA/Rockwell was prime contractor for the command and service module (CSM) and S-II stage of the Saturn V. Grumman was prime contractor for the LM. Martin Marietta (began as Martin before the merger) was the prime contractor for the Titan II booster used for Gemini.  | |
Contact Us | The Source for Space History & Artifacts
Copyright 1999-2025 collectSPACE. All rights reserved.

Ultimate Bulletin Board 5.47a
|
|
|
advertisement
|